Caterpillar MWM TCG2020V20 2MW 50Hz motor till Caterpillar MWM TCG2020V20
PDF
Dela
Facebook
WhatsApp
Viber
Telegram
1/1
PDF
Dela
Facebook
WhatsApp
Viber
Telegram
1 €
Nettopris
≈ 11,44 kr
1,24 €
Bruttopris
Kontakta säljaren
Typ:
motor
Referensnummer:
MWM TCG2020V20 2MW 50Hz
Originalets katalognummer:
MWM TCG2020V20 ; CG170-20; 2MW 50Hz
Reservdelstyp:
original reservdel
Tillverkningsår:
2024-05
Plats:
Österrike Hörsching7279 km från dig
Publiceringsdatum:
7 dec. 2024
Återförsäljares lager-ID:
MWM TCG2020V20
Beskrivning
Motoreffekt:
2650 hk (1948 kW)
Cyl num:
2
Motortyp:
V-typ
Turbo:
Bränsle:
gas
Euro:
5
Motor
Turbo:
Euro:
Euro 5
Skick
Skick:
återtillverkad
Garanti::
1 år
Viktigt
Detta erbjudande är endast för vägledning. Begär mer exakt information från säljaren.
Köptips
Säljarens kontaktuppgifter
Prenumerera på säljare
R.Schwarzmuller
Språk:
Engelska
+358 50 53...
Visa
+358 50 5345498
+358 9 231...
Visa
+358 9 23165797
Adress
Österrike, Wien, 4063, Hörsching, Flughafenstrasse 3
Återförsäljarens lokala tid:
16:53 (CET)
Skicka meddelandet med e-post
Säljarens kontaktuppgifter
ETC EUROPE TRUCK FINLAND OY
Österrike
9 år på Machineryline
Prenumerera på säljare
+358 50 53...
Visa
+358 50 5345498
+358 9 231...
Visa
+358 9 23165797
Fråga säljaren
PDF
Dela
Facebook
WhatsApp
Viber
Telegram
Säljer du maskiner eller fordon?
Du kan göra det med oss!
Liknande annonser
1 €
≈ 11,44 kr
MWM TCG2032V16
gas
Österrike, Hörsching
Kontakta säljaren
1 €
≈ 11,44 kr
MWM TCG2020V16
gas
Österrike, Hörsching
Kontakta säljaren
1 €
≈ 11,44 kr
MWM TCG2032V16 gas modular power plant
gas
Finland, Helsinki
Kontakta säljaren
pris på begäran
254-9233 435-1677
USA
Kontakta säljaren
pris på begäran
195-3816 10R-5596
USA
Kontakta säljaren
pris på begäran
467-5380
USA, New York
Kontakta säljaren
65 000 US$
≈ 63 110 €
≈ 722 000 kr
359-2103
USA, New York
Kontakta säljaren
pris på begäran
CAT 3406 525hp
Nederländerna, Ven-Zeldenheide
Kontakta säljaren
pris på begäran
153-6513 Cartridge GP - 180-9192 GP-Turbocharger 180-5445 10R-2341 -A
Turkiet, İstanbul
Kontakta säljaren
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.